Skip to content

Announced Public Auction for Road Construction Project in Solnechniy, Krasnoyarsk

Government procurement site announces tender for construction of a new automobile road linking the Solnechniy district with the residential district of Solonets-2 and the Northern highway. The construction project is divided into two phases and multiple routes. The long-awaited direct road from...

Government site for public procurement announced a tender for building a new automobile road...
Government site for public procurement announced a tender for building a new automobile road connecting the Sunny district with the residential district of Solonets-2 and the Northern Highway. The construction project is divided into two stages and several routes. The long-awaited direct road from the Airport to Sunny district is expected to be completed by the end of 2027.

Announced Public Auction for Road Construction Project in Solnechniy, Krasnoyarsk

Let's get down to business, buddy! It seems the feds have announced a tendy for building a new highway jewel connecting Solnechniy and Solonets-2 with the North Shore, layin' the groundwork for a smoother ride between these star-crossed locales. Here's the lowdown on this much-anticipated arterial upgrade.

First things first, this project is divided into two main stages, with several construction "routes" in the mix. The long-awaited direct route from Runway to Solnechniy is slated to wrap by the end of 2027, no joke.

This new highway is meant to solve the Eneisei Highway traffic woes, 'cause it's the lone proper highway leading to Solnechniy at the moment. You could call the area around Solnechniy a fast-growing metropolis, what with its rapid expansion. The booming population, however, puts quite a strain on the existing road network, so an swift solution is a must.

Residents of Solnechniy are always complaining about traffic jams and struggle to get to work and back. The new route is planned to start from the new highway interchange at the North Shore and Aviator Street, continue through A. Tavakov Street, Soakovskaya Street, and Gribov Street. Not only will this route provide an additional route to Solnechniy, but it will also greatly alleviate the load on the Eneisei Highway, which is currently crippled under immense pressure.

The construction funding is expected to come from the federal budget loan of around 2 billion rubles and the regional budget's allocation of an extra 176 million rubles. The tendy was put out by the Government Procurement Agency of Krasnoyarsk Krai.

From what the docs show, the highway will have varying lane configurations depending on the sections, ranging from six to four lanes.

Overall, the total length of the new highways, both city and district, will be about 7.3 kilometers, with an estimated speed limit of 50 km/h. The driveway width will be 15 meters (22.5 meters on the six-lane section), and there will be sidewalks ranging from 2.25 to 3 meters.

Dela reported that the highway design and construction are part of the preparations for the 400th anniversary of Krasnoyarsk. The tender deadline is set for April 8, with construction set to start this year, and highway opening planned for October 30, 2027.

Here's an intriguing factoid – this highway construction is part of the broader preparation for Krasnoyarsk's 400th birthday. Keep in mind that this info is based on publicly available sources, so it's always a good idea to double-check with the appropriate authorities for the most accurate, up-to-date details on this project. If you have any follow-up questions or need specifics, feel free to hit me up!

Cheers, buddy! Let's get this highway built, fo real!

(Image: Tender documents, 1640 feet)

The upcoming highway construction, anticipated for Krasnoyarsk's 400th anniversary, is a significant development in the industry, particularly in the transportation sector. This project, which includes a new route from Runway to Solnechniy, could potentially alleviate financial burdens on the residents due to reduced traffic congestion, a common issue caused by the rapid growth of Solnechniy's metropolis. The tendy for this project, backed by a federal budget loan of around 2 billion rubles and a regional allocation of 176 million rubles, is open till April 8, with construction expected to commence this year and the highway set to open on October 30, 2027.

Read also:

    Latest